000 04282cam a2200769 i 4500
001 ocn840934616
003 OCoLC
005 20220701010917.0
006 m o d
007 cr |||||||||||
008 130411s2013 nju ob 001 0 eng
010 _a 2013015017
040 _aDLC
_beng
_erda
_epn
_cDLC
_dYDX
_dEBLCP
_dN$T
_dIDEBK
_dE7B
_dMEAUC
_dYDXCP
_dTEFOD
_dDG1
_dCUS
_dCOO
_dSTF
_dOCLCQ
_dDEBSZ
_dTEFOD
_dDEBBG
019 _a862790731
020 _a9781118419137
_q(pdf)
020 _a1118419138
_q(pdf)
020 _a9781118421062
_q(epub)
020 _a111842106X
_q(epub)
020 _a9781118802717
_q(electronic bk.)
020 _a1118802713
_q(electronic bk.)
020 _a9781299775923
_q(MyiLibrary)
020 _a1299775926
_q(MyiLibrary)
020 _z9781118139233
_q(cloth :
_qacid-free paper)
020 _z1118139232
_q(Paper)
020 _z9781118139233
_q(Paper)
029 1 _aAU@
_b000050821201
029 1 _aNZ1
_b15351142
029 1 _aNZ1
_b15548641
029 1 _aDEBSZ
_b431471746
029 1 _aAU@
_b000058200113
029 1 _aDEBBG
_bBV043395747
035 _a(OCoLC)840934616
_z(OCoLC)862790731
037 _a85CFFD70-6901-457A-8F0B-C05747CDAFEB
_bOverDrive, Inc.
_nhttp://www.overdrive.com
042 _apcc
050 0 0 _aTH438
072 7 _aTEC
_x009020
_2bisacsh
082 0 0 _a624.068/4
_223
049 _aMAIN
100 1 _aDelPico, Wayne J.
245 1 0 _aProject control :
_bintegrating cost and schedule in construction /
_cWayne J. Del Pico, CPE.
264 1 _aHoboken, New Jersey :
_bJohn Wiley & Sons, Inc.,
_c2013.
300 _a1 online resource.
336 _atext
_btxt
_2rdacontent
337 _acomputer
_bc
_2rdamedia
338 _aonline resource
_bcr
_2rdacarrier
490 1 _aRSMeans
500 _a"Published simultaneously in Canada"--Title page verso.
504 _aIncludes bibliographical references and index.
505 0 _aThe Basics -- Introduction to Project Control -- Pre-Construction Planning -- The Schedule -- The Budget -- Integrating the Schedule and the Budget -- Calculating and Analyzing Progress -- Analyzing & Reporting Variances in Schedule and Cost -- Recognizing Trends and Forecasting Performance -- Productivity -- Acceleration and Schedule Compression -- Resource Management -- Risk Management -- Project Closeout.
588 0 _aPrint version record and CIP data provided by publisher.
520 _a4 The Schedule; Basic Scheduling Concepts; Types of Schedules; The Checklist; The Schedule Board; The Bar Chart; The Look Ahead; The Linear Schedule; Advanced Scheduling Methods; Program Evaluation and Review Technique; Critical Path Method (CPM); The CPM Schedule as a Management Tool; Tasks; The Work Breakdown Structure; Task Types; Task Descriptions; Task Durations; Interdependencies; Complex Relationships-Lags and Leads; Milestones and Constraints; Float; Updating the Schedule; Summary; 5 The Budget; Fundamentals of the Estimating Process; Types of Estimates.
520 _aReasons and methodologies for proper planning, monitoring, and controlling construction project costs and schedule The key to successful construction project control is the fusing of cost to schedule, enabling the management of one to help the management of the other. This requires that a task's cost and its duration have a direct relationship, not an arbitrary assignment by the scheduler. Ensuring that relationship is correct and setting the appropriate baseline for tracking is the domain of the project control analyst. Written by a seasoned professional in the field, Pro.
650 0 _aConstruction projects
_xManagement.
650 0 _aBuilding
_xEstimates.
650 0 _aScheduling.
650 4 _aBuilding
_xEstimates.
650 4 _aConstruction projects
_xManagement.
650 4 _aScheduling.
650 7 _aTECHNOLOGY & ENGINEERING
_xCivil
_xGeneral.
_2bisacsh
655 4 _aElectronic books.
655 0 _aElectronic books.
655 7 _aElectronic books.
_2local
776 0 8 _iPrint version:
_aDelPico, Wayne J.
_tProject control.
_dHoboken, New Jersey : John Wiley & Sons, Inc., [2013]
_z9781118139233
_w(DLC) 2013001240
_w(OCoLC)828481149
830 0 _aRSMeans.
856 4 0 _uhttp://dx.doi.org/10.1002/9781118802717
_zWiley Online Library
994 _a92
_bDG1
999 _c20409
_d20368